SCOPE OF WORK

Installation of winch mooring line monitoring system
Removal of red clamp
Removal of flare tip transportation clamps
Punch killing activities and other carry over work for preservation and cleaning

DESCRIPTION OF THE PROJECT

Three major oil discoveries have recently been made in Blocks 28/9 and 28/10c of the UK North Sea: Catcher, Varadero and Burgman. The fields are located approximately 200 km east of Aberdeen in 85 to 95 m water depth. The turret mooring and fluid transfer system for the proposed Catcher FPSO will be a Submerged Turret Production (STP) system.

BW Offshore has been contracted for the offshore installation of the mooring system and STP buoy and hook-up of the FPSO in field. The Installation of the riser system, pipelines, EHU’s, subsea manifolds and drilling templates has been performed by Subsea 7 in 2016 offshore installation Campaigns.

The mooring system, STP buoy and riser systems were installed in Q2, 2016. The FPSO scheduled to arrive on location for hook-up to the STP buoy in Q3, 2017.