PFLNG 2 Mooring & Hook up

PFLNG 2 Mooring & Hook up

PFLNG 2 Mooring & Hook up

Location: Malaysia
Project Type : PFLNG
Date : 2019

SCOPE OF WORK

Pre-Mobilization Activities
Deck Survey And Markings
Lay Spread Sea-fastening, hook-up and function test
Sea-fastening and NDT for all lay spread
Function test for all lay spread
Load test for MDCW and winches sea-fastening
Equipment Load-Out And Sea-Fastening
RemainingEquipment / items load-out
Seafasteningand NDT
Function test SIT
Load test for HOP #1, HOP #2 and winches /
Tuggersea-fastening

DESCRIPTION OF THE PROJECT

Petronas FLNG2 is to be moored in Rotan Field, 240km offshore Sabah, Malaysia
• Taut leg mooring system
• 12 suction piles & polyester rope/ chain mooring lines
• Subsea7 scope is the T&I of the mooring system
• WP2 (2019) will pre-lay the mooring lines
• WP3 (2020) will hook-up the moorings to the PFLNG
Rotan Field, 1300m WD (1247m to 1327m)