Location: Nigeria
Type of personnel: RAT & Diving
Support: VIKING FORCADOS
Date: 2012
SCOPE OF WORK
RAT: work on Riser installation project.
Diving: Installation of 3 large diameters welded launched risers in very shallow water (4.6m water depth), with the vessel positioned 150m away from the platforms.
- Installation of flanged risers, tee, wye and spools up to a 28-inch diameter
- One above water tie-in
- 900,000 man hours with ZERO LTI
- Approximately 1300 dives on different vessels